| It does not take much of an injury
| |
| | specifications, when you apply for the
|
| nowadays to be worth a lawsuit of $10,000
| |
| | permit.
|
| and a really serious injury can well cost
| |
| | The permit is not difficult to get if
|
| an owner $100,000 or more.
| |
| | your plans are complete and meet certain
|
| The cost of insurance is a small drop in
| |
| | minimum requirements.
|
| the ocean compared to this.
| |
| | Before you complete your plans, you
|
| Juries are inclined to be very
| |
| | should secure from the building
|
| sympathetic toward an accident victim and
| |
| | department a little booklet or a folder
|
| to be rather liberal with the money of
| |
| | of typewritten sheets giving the building
|
| the insurance companies. As they are not
| |
| | requirements in your district.
|
| allowed to be told whether you are
| |
| | Then you can draw your plans so that they
|
| insured or not, they assume that you are
| |
| | give the necessary information.
|
| carrying insurance. Be safe and carry the
| |
| | The usual requirements include:
|
| necessary legal protection.
| |
| | Floor plan showing all dimensions,
|
| In some places a department of the state
| |
| | plumbing fixtures, light fixtures, window
|
| handles all the workmen's compensation
| |
| | and door sizes, and the use of each room.
|
| insurance; in others, private insurance
| |
| | Foundation plan showing size of
|
| companies may operate in the compensation
| |
| | foundation and footings.
|
| field.
| |
| | Roof plan showing hips, valleys, and
|
| Find out and be legally protected against
| |
| | slope of roof, and the kind of roofing
|
| all lawsuits arising from accidents or
| |
| | material.
|
| incidents of your building operations.
| |
| | At least two elevations, the front and
|
| The cost of compensation insurance for
| |
| | one end. Cross section showing how to
|
| the entire job probably wouldn't be more
| |
| | house is to be built.
|
| than $40 or $50, and it doesn't pay to
| |
| | Plot plan showing how far the house is to
|
| take a chance.
| |
| | be from the street, the distance from the
|
| Contractors and sub-contractors are
| |
| | lot lines on the sides, the sewer lines,
|
| supposed to carry their own compensation
| |
| | the septic tank in case there is no
|
| insurance, but it is well to inquire into
| |
| | sewer, where the water pipe comes in,
|
| it before you let them start to work, as
| |
| | where the gas meter is located, and where
|
| you are liable for anything that happens
| |
| | the electric service enters the building.
|
| on your job.
| |
| | If you have a little time but not much
|
| If they do not carry the proper
| |
| | money, then you will have to build the
|
| insurance, then you should carry it, or
| |
| | house instead of paying someone else to
|
| not hire them; find someone who is
| |
| | do it.
|
| properly insured.
| |
| | It is a good idea to use a mortgage
|
| Building Permit
| |
| | calculator when you use a mortgage to buy
|
| Most cities and many counties require
| |
| | your house.
|
| that you get a permit before you start
| |
| | A percentage point does not look much but
|
| building.
| |
| | it is surprising how it can make a big
|
| You will furnish the licensing agency two
| |
| | difference to your total outlay over 25
|
| complete copies of the plans and
| |
| | years.
|