| Laying out the site and building the
| |
| | below or through the foundation. Provide
|
| foundationInstall temporary power and
| |
| | plumbing connections for water and heater
|
| have electricity hooked up. Lay out site,
| |
| | throughout home. Install exterior water
|
| install batter boards, dig foundation
| |
| | faucets. Cut dryer vents through floor
|
| trenches and install the foundation
| |
| | and the exterior of the house. Inspection
|
| forms. Pour footings, build foundation
| |
| | of plumbing and wiring. Provide
|
| walls and piers, and install mud sills.
| |
| | electrical service from power company.
|
| Have the foundation inspected.Setting
| |
| | Have electric, gas and water utilities
|
| House UnitsWork crews lift components by
| |
| | turned on.Heating and CoolingInstall
|
| crane onto the foundation.RoofingInstall
| |
| | heating and air conditioning systems.
|
| knee boards, collar ties and rafter
| |
| | Inspection of heating and air
|
| supports. Install gable end walls,
| |
| | conditioning systems.Steps, Porches,
|
| structure wood and supports. Install roof
| |
| | Decks, Driveways and SidewalksInstall
|
| vents. Install roof underlayment and
| |
| | steps, porches, decks, driveways and
|
| shingles on hinge rows. Install ridge cap
| |
| | sidewalks where applicable.Interior
|
| shingles.DormersIf applicable, cut out
| |
| | finish interior wall and ceiling dry wall
|
| roof, install dormer walls, trusses, roof
| |
| | repairs and painting. Complete
|
| decking, roof edge, tar paper, roll
| |
| | installation of archway and casing.
|
| roofing in valleys, install shingles,
| |
| | Install stairway walls, drywall, and
|
| metal flashing on front wall, install
| |
| | stair rails to second floor and paint,
|
| windows and finish trim.Exterior Complete
| |
| | where applicable. Finish flooring, carpet
|
| installation of exterior siding and trim,
| |
| | to carpet splice, carpet to tile splice.
|
| soffit and fascia. install windows in
| |
| | Finish installing interior doors and
|
| gable ends. Paint exterior doors and door
| |
| | trim. Finish installing light fixures and
|
| jambs. Install shutters and optional
| |
| | ceiling fans. Finish installing shower
|
| exterior storm/security doors.Complete
| |
| | doors, appliances and
|
| Plumbing, Wiring and Utility
| |
| | accessories.Completion clean up of site
|
| HookupsInstall any under floor
| |
| | outside and clean inside. Provide grading
|
| mechanicals, under floor plumbing and
| |
| | and seeding of disturbed land areas. Have
|
| electrical work. Complete electrical
| |
| | the final inspection and secure
|
| hookup throughout home. inspect pipelines
| |
| | certificate of occupancy. Move in.
|